Click for Before and After Pictures
Basement - The grease trap in the kitchen has been replaced. Harry, on the ladder, is helping with the installation from downstairs below the kitchen.
Basement - View of the below the kitchen
Basement - Steps, handrails and walls leading downstairs were repainted.
First Floor - New carpet was installed on the ballroom stairs and the wall and handrails were repainted. Gene is on the stairs. It has been an ongoing project of Gene’s to convert the downstairs into a usable area. He has built a platform, covered the dirt floor, installed shelving, organized and much more.
First Floor - Three double doors in the ballroom were repaired and replaced.
Second Floor - A dollhouse with furniture was a gift to the Chateau. It has been lovingly renovated inside and out. It’s on display at the top of the ballroom stairs.
This house is unusual in that it can be opened from the front, as well as the back. It sits on a turntable so that it can be turned 360 degrees.
Second Floor - Flooring around the second floor fireplace is being repaired. Each wooden square is being artfully recreated with six individual strips to match the pattern of the original floor. This is a time-consuming project being done over time by Gene.
Woodwork around the stained-glass windows in the second floor bath has been repaired and painted.
Fireplace Restoration
Upper Patio Restoration
Designed with Love by